Monday, April 25, 2011


Fix weatherboard by its full length and do not joint over opening, do not joint too close to another joint, line all nail fixing vertically and horizontally with pre-drill holes, no damage should be made to the face of weatherboard, cut all joints and corner with 45˚ cuts and prime all cut

Start from the bottom of the building and work your way up the wall. Set the first weather on the very bottom mark set with the story rod and temporary nail the top of the board on batten, level the top edge of the weatherboard and make sure there is 15mm cover over the vent strip

No comments:

Post a Comment