Pre-nail framing deliver to site with number labeled by manufacturer supplied with a manufacturer plan
Always check on site plane making sure the wall framing are in right direction for door/window/walldrob opening, framing will also be labeled with junction of wall to wall, treatment on bottom/top plate can also indicate is the framing right way up
Thursday, October 28, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment