Brace the bearers one row to the other from the jack piles to soleplate, check the measurement of bearer spacing and make adjustment to bearer if necessary.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
►
2011
(14)
►
May
(3)
►
April
(11)
▼
2010
(38)
►
December
(13)
►
October
(9)
▼
September
(16)
on boundar marking out SJ (sheet Joint) for floori...
fixing a piece of timber on the joints of the jois...
using combination square to level joist when fixin...
Boundary joists all connect with 45 degree cut and...
H3.2 boundary joist cut at 45 degree angle at joi...
Joist is to be sit camber up and plan to level later
Marking out location of wet area for H3.2 joist an...
Brace the bearers one row to the other from the ja...
Cut two end piece of jack studs to height and brac...
Setting the jack stud by marking where the rows of...
Two other profile was set up by other group on bot...
String line was then transfer from ground onto bat...
Start on building Unitce house today, one group m...
line from 4 corners marking-out BL, this is the ha...
marking out 4 corner with pags then using dumpy to...
Started on profiling practice today, learn how to ...
About Me
Ted
View my complete profile
No comments:
Post a Comment