String line was then transfer from ground onto batter board, using 345 method to estabilsh BL.
Another batter board was set up 400mm bellow the FFL which marks out the top of jack stud.
Sunday, September 19, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment