on boundar marking out SJ (sheet Joint) for flooring according to lenght of the sheet manufactured, joist on the point will need to be fix centre to the joint of both sheets allowing enough space for fixing, by using string line to straighten the joist. Nogging between joist are fixed after the joist has been accurated located
Sunday, September 19, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment