Sunday, April 24, 2011















Building wrap is to be wrap around the building from bearer upward in full length of the wrap, wrapping top over the bottom sheet if more covering is required, minimum 150mm is required for all lapping

Blue ribbon tape is then fix around the house in between the space of the nogs stopping building wrap blow against the exterior cladding.

No comments:

Post a Comment