Sunday, April 24, 2011


Fix nogs between framing to create a space for power box to fix to. Creat moisture resistant opening as window and seal with flashing on top and side of the power box. Alue Band tap head flashing and vent strap on top of the power box and fix extra cavity batten around for weatherboard.

No comments:

Post a Comment